Building approval is approaching

1.10.2024

In the coming month, we are waiting for the most important point of the whole Slovákova XII project, the building approval.

Inside and outside, the final finishing touches are being applied. Golden lights and railings have been installed in the corridors, and beautiful azure tiles have been laid. Mailboxes await the unveiling of the lobby painting. The upper terraces are also getting their final look.

A new sidewalk is being paved around the commerce-future café, which will soon be open to the public.